Bathroom Renovation in Highgate & Islington

Completed North London shower room with large grey tiles, black-framed glazing and matt-black fittings

Highgate & Islington bathroom project

Large-format grey tiles, slim black-framed glazing and coordinated matt-black fittings give this compact shower room a calm, precise finish.

Two-week programmePlanned and delivered in fourteen days.
Insured workProfessional cover for added reassurance.
Two-year warrantyLabour is covered for two years.
Highgate & IslingtonNorth London
Bathroom renovationCompact shower room
Two weeksPlanned programme
Grey & blackClean contemporary finish
Finished vanity and black-framed shower enclosure in the renovated North London bathroomMatt-black shower fittings, illuminated mirror and grey tiling

The design

A compact room, carefully resolved

The brief was to replace a dated bath and make better use of a small footprint. A walk-in shower, wall-mounted vanity and mirrored storage create a more practical room without adding visual clutter.

Large grey tiles keep the surfaces calm while the black shower frame, tap, flush plate and accessories give the room a consistent architectural line. Lighting around the mirror adds a softer layer for everyday use.

  • Layout and service planning before work began
  • Full strip-out, preparation and waterproofing
  • Coordinated plumbing, lighting, tiling and installation
  • Final snagging, testing and clean before handover

Before and during

From the original room to a prepared shell

The original bath, tiling and sanitaryware were removed before the room was rebuilt around the new shower layout. These photographs show the genuine starting point and preparation work.

BeforeOriginal North London bathroom before renovation with white tiles, black border and shower curtain
The original bath and shower area before strip-out.
BeforeOriginal separate toilet area before the bathroom renovation
Existing sanitaryware and storage before the room was reworked.
PreparationBathroom floor and services exposed during preparation work
Floor and services exposed ready for the new layout.
PreparationBathroom walls stripped back during the renovation
Walls stripped back so the new installation could begin correctly.

What the work included

One coordinated renovation, from strip-out to final detail

The room was carefully sequenced around the selected materials and the agreed two-week programme.

01

Strip-out and first fix

The existing bathroom was removed, services were adjusted and the walls and floor were prepared for the new shower layout.

02

Waterproofing and tiling

Wet areas were tanked before the large-format grey tiles were measured, set out and installed.

03

Installation and finish

The shower enclosure, vanity, lighting and black fittings were installed before final sealing, checks and handover.

Finished details

Clean lines, useful storage and a consistent palette

Every finished photograph below is from this North London project.

Fourteen-day programme

A clear sequence kept the project moving

Materials were organised before work began and each trade followed a coordinated programme, helping the renovation reach handover in two weeks.

Days 1–3

Strip-out and first fix

Removal, plumbing changes and preparation of the room, walls and floor.

Days 4–8

Waterproofing and tiling

Tanking of wet areas followed by measured setting out and tile installation.

Days 9–11

Second fix

Installation of the sanitaryware, lighting, shower enclosure and fittings.

Days 12–14

Finish and handover

Sealing, final detailing, snagging, testing and a thorough clean.

Why Diamond Deer

Careful work, properly managed

Diamond Deer coordinates the renovation from the first practical decisions through to the final checks. Homeowners have one experienced team managing the sequence, the workmanship and the finishing details.

Bathroom renovations typically take around one and a half to two weeks, depending on the room, specification and any structural or service changes required.

10-year track recordExperienced in carefully planned kitchen and bathroom renovation work.
InsuredProfessional insurance provides added reassurance while work is under way.
Two-year labour warrantyDiamond Deer’s workmanship is covered for two years after completion.
North London coverageWorking in Highgate, Islington, Hackney, Highbury and surrounding areas.

Questions before you begin

Bathroom renovation FAQs

A few practical answers for homeowners planning a bathroom renovation in Highgate and Islington and North London.

How long does a bathroom renovation usually take?

A typical bathroom renovation takes around one and a half to two weeks. The exact programme depends on the room, specification and whether the layout or services need to change.

Do you manage the complete bathroom project?

Yes. Diamond Deer coordinates planning, preparation, plumbing, electrics, waterproofing, tiling, installation, finishing and final checks.

Is the work insured and covered by a warranty?

Yes. Diamond Deer is insured and provides a two-year labour warranty for added reassurance after the renovation is complete.

Which areas do you cover around Highgate and Islington?

We work across Highgate, Islington, Hackney and surrounding areas and wider North London.

Planning a bathroom renovation in Highgate or Islington?

Tell us about the room, your preferred finish and your postcode. We will help you understand the next practical step.