Highbury N4 bathroom project
Deep green tiles, a geometric floor, warm orange accents and matt-black fittings give this compact bathroom a distinctive, balanced character.
The design
Confident colour, grounded by careful detailing
The original beige bathroom was replaced with a clearer shower-room layout and a much stronger identity. Deep green tiles define the wet area, while the geometric floor and warm orange vanity wall introduce colour without overwhelming the compact space.
Black fittings, a dark wall-mounted vanity and slim shower glazing connect the elements. The result feels individual, practical and carefully resolved.
- Layout and service planning before work began
- Full strip-out, preparation and waterproofing
- Coordinated plumbing, lighting, tiling and installation
- Final snagging, testing and clean before handover
Before the renovation
The genuine starting point
These photographs show the original beige bathroom before strip-out. The bath, shower screen, sanitaryware, vanity and finishes were removed before the new layout and palette were installed.




What the work included
One coordinated renovation, from strip-out to final detail
The room was carefully sequenced around the chosen materials and the agreed one-and-a-half-week programme.
Strip-out and first fix
The original bathroom was removed, services were adjusted and the walls and floor were prepared for the new shower-room layout.
Waterproofing and tiling
Wet areas were prepared before the green wall tiles and geometric floor were measured, set out and installed.
Installation and finish
The shower glazing, vanity, lighting, sanitaryware and black fittings were installed before final sealing and checks.
Finished details
A distinctive palette with a practical layout
Every finished photograph below is from this completed Highbury N4 project.





One-and-a-half-week programme
A clear sequence kept the project moving
Materials were organised before work began and each trade followed a coordinated programme, helping the renovation reach handover in around ten working days.
Strip-out and first fix
Removal, service changes and preparation of the room, walls and floor.
Waterproofing and tiling
Preparation of wet areas followed by careful tile setting-out and installation.
Second fix
Installation of the sanitaryware, lighting, shower glazing and fittings.
Finish and handover
Sealing, final detailing, snagging, testing and a thorough clean.
Why Diamond Deer
Careful work, properly managed
Diamond Deer coordinates the renovation from the first practical decisions through to the final checks. Homeowners have one experienced team managing the sequence, workmanship and finishing details.
Bathroom renovations typically take around one and a half to two weeks, depending on the room, specification and any structural or service changes required.
Questions before you begin
Bathroom renovation FAQs
Practical answers for homeowners planning a bathroom renovation in Highbury and wider North London.
How long does a bathroom renovation usually take?
A typical bathroom renovation takes around one and a half to two weeks. The exact programme depends on the room, specification and whether the layout or services need to change.
Can you work with stronger colours and finishes?
Yes. We help coordinate tiles, paint colours, flooring, sanitaryware and fittings so a bolder palette still feels balanced and practical.
Is the work insured and covered by a warranty?
Yes. Diamond Deer is insured and provides a two-year labour warranty for added reassurance after the renovation is complete.
Which areas do you cover around Highbury?
We work across Highbury, Highgate, Islington, Hackney and surrounding areas throughout North London.
Planning a bathroom renovation in Highbury?
Tell us about the room, your preferred finish and your postcode. We will help you understand the next practical step.